Team
David Hengelbrok, P.E., PSP
Sr. Schedule Consultant

David Hengelbrok, P.E., PSP, analyzes construction defects, delay claims, and disputes that arise during and after construction. He holds a civil engineering degree from the University of Florida.
David pairs forensic analysis with hands-on project controls. He performs CPM scheduling for clients using Primavera P6, including project schedules, schedule narratives, and time impact analyses on active multifamily developments, and he inspects on-site conditions in support of engineering opinions. He has supported expert reports and testimony on delay, disruption, acceleration, productivity, termination, unearned value, and associated damages, as well as construction defect investigations involving mechanical systems, building envelopes, and destructive testing. He has also performed hurricane-related structural damage analyses for insurance claim determinations.
Before joining the firm, David was a field engineer with a national marine construction contractor, serving as lead engineer on hydraulic dredging projects along the U.S. coast, conducting hydrographic and topographic surveys, and leading on-site teams of engineers and surveyors. His project experience includes bridges, highways, airports, levees, ports, stormwater treatment areas, courthouses, schools, hotels, high-rise residential, and aerospace facilities.
Licenses & Certifications
- Florida Professional Engineer PE 93179
- AACE International Planning and Scheduling Professional (PSP) #PSP-3013
Practice Areas
- CPM scheduling (Primavera P6)
- Delay and time impact analysis
- Disruption and productivity analysis
- Construction defect investigation and site inspection
- Hurricane and wind structural damage analysis
Education
- B.S., Civil Engineering, University of Florida, 2014 (Minor in Business Administration)
